Septuagenarian run over by bus

[email protected] (CD Network)
June 5, 2012

Udupi, June 5: A 70-year-old woman died on the spot as a bus ran over her on the NH-66, at Nittur, near here on Monday.

The decease has been identified as Korathi Poojary, a local resident.

When she was boarding the bus opposite State Home, a speeding lorry plying towards Mangalore, dashed against the bus from behind throwing her onto road from the foot board. As she fell down from the bus after being pushed by the lorry, bus ran over her.

Though she was rushed to the hospital in a 108 ambulance, doctors declared she was brought dead.

Udupi town police registered a case and investigating.

bus_accident




Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
November 10,2024

tokkottudeath.jpg

Mangaluru: A tragic accident took place on Saturday at Chembugudde near Thokkottu, claiming the life of a 47-year-old woman after a tanker lorry ran over her. The victim, identified as Rahmat H Rashid, was riding pillion with her husband, Abdul Rashid G, on their scooter. 

The couple was traveling from Yenepoya Hospital to Bajpe when the scooter skidded on the poorly maintained road. Rahmat fell onto the road and was fatally struck by a tanker lorry that was coming from behind. Despite being rushed to the hospital, doctors declared her dead upon arrival.

The incident prompted a swift response from the DYFI Ullal Taluk Committee, which staged a protest on Saturday night, condemning the unsafe condition of the road. Nithin Kuthar, president of the committee, criticized MLA and Legislative Assembly Speaker UT Khader for failing to ensure safe infrastructure, despite touting the road as toll-free. 

Kuthar demanded immediate repairs, warning that the committee would march to the MLA’s office with black flags if the road is not fixed within a week.

Former DYFI State President Sunil Kumar Bajal also voiced frustration over the deteriorating condition of Thokkottu market, highlighting the struggles people face while crossing roads riddled with dangerous potholes. In response to public outcry, temporary repairs were made to the road at Chembugudde on Sunday, though locals remain wary and demand a more permanent solution. 

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
News Network
November 5,2024

Mangaluru: Pilikula Biological Park has welcomed several exotic species, including a six-year-old Asiatic lion, a wolf, two gharial crocodiles, and four rare birds (two silver pheasants and two yellow-golden pheasants), as part of an animal exchange programme with Nandankanan Zoological Park, Odisha. The exchange was approved by the Central Zoo Authority, marking a major addition to Pilikula Zoo's growing collection.

Animal Exchange Details

Park Director H Jayaprakash Bhandary provided insights into the exchange programme. In return for the new arrivals, Pilikula Zoo will send four dholes (wild dogs), four rare reticulated pythons, two Brahminy kites, three Asian palm civets, and two large egrets to Nandankanan Zoo. Notably, all animals sent from Pilikula were born in the zoo, showcasing the zoo's success in breeding rare species.

Purpose of the Exchange

The animal exchange programme serves multiple purposes, including providing companions for solitary animals and preserving pure bloodlines. Pilikula Zoo already houses three lions, and the new male Asiatic lion was introduced as a companion. Since the number of Asiatic male lions in Indian zoos is relatively low, the zoo sourced this lion from the distant Nandankanan Zoological Park.

Care During Transport

To ensure the animals' safety and well-being during the 2,000-kilometre journey — the longest distance covered in Pilikula’s animal exchange history — two veterinary officers and eight caretakers from Nandankanan accompanied the animals. Both zoos will share equal responsibility for the care of the exchanged animals.

Future Animal Additions and Revenue Boost

Pilikula Biological Park, home to approximately 1,200 animals, birds, and reptiles, is one of India’s 18 large zoos. Discussions are ongoing for future exchanges with other prominent zoos, including Chhatbir Zoo in Punjab, Byculla Zoo in Mumbai, and the Madras Crocodile Bank. The zoo also plans to introduce rare species like the Anaconda and the Humboldt penguin, for which special enclosures will be built, thanks to donor contributions.

The addition of these rare animals and birds is expected to boost the zoo’s revenue, helping it become self-sustaining, Bhandary said.

Quarantine and Public Display

Before being introduced to the public, the new arrivals will spend around 15 days in a quarantine ward to adapt to the local environment. They will receive necessary vaccinations and treatments during this period, after which they will be displayed to visitors.

Record-breaking Exchange

This animal exchange marks a significant achievement for Pilikula Zoo, with the animals being transported over approximately 2,000 kilometres from Nandankanan Zoological Park. This sets a new record, surpassing the previous longest exchange with Udaipur Zoo in Rajasthan, which was around 1,700 kilometres.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.
coastaldigest.com news network
November 5,2024

watermetro.jpg

Mangaluru: The Karnataka Maritime Board (KMB) has initiated the groundwork for the much-anticipated Mangaluru Water Metro Project (MWMP). The project, which was first announced by Chief Minister Siddaramaiah during the state budget presentation, aims to introduce water-based public transport along the Gurupur and Netravathi rivers in Mangaluru.

The proposed Mangaluru Water Metro will follow in the footsteps of Kochi's successful Water Metro system, which has become a model for eco-friendly and efficient urban transport in India. The KMB will now conduct necessary feasibility studies to assess how this concept can be adapted to Mangaluru's unique geographical and urban landscape.

A 30-Kilometer Stretch Connecting 17 Key Locations
According to a senior officer from KMB, the project will span a 30-kilometer route that connects key points across the rivers and coastline. The water metro service will cover locations such as Bajal, Kulur Bridge, New Mangaluru Port, Sultan Battery, Tannirbhavi, Old Port, Hoige Bazaar, and Someshwar Temple. The service aims to link 17 important points, benefiting both daily commuters and tourists. This initiative not only seeks to reduce congestion in Mangaluru but also promises to boost tourism and recreational activities by providing an alternative mode of transport.

Focus on Eco-Friendly and Efficient Water Transport
The Mangaluru Water Metro will feature modern catamaran boats, which may be powered by electric or diesel engines. These boats will be equipped with essential amenities to ensure smooth and safe operations. The project’s emphasis on sustainability means that the boat fleet will be designed to minimize environmental impact, making water transport both eco-friendly and economically viable.

Feasibility Study to Shape Project Design
The initial feasibility report will cover several crucial aspects, including the placement of water metro stations. These locations will be chosen based on factors such as passenger demand, availability of land, connectivity to other transport modes, and sustainability. A detailed LiDAR (Light Detection and Ranging) survey will further aid in mapping the river routes and surrounding areas, providing precise data for the project’s planning phase.

In addition to assessing operational needs, the feasibility study will also project future demand for water metro services over the next 25 years. By exploring various scenarios, planners can ensure that the water metro is designed to accommodate both current and future user requirements.

Special Purpose Vehicle for Project Management
The report is expected to recommend creating a Special Purpose Vehicle (SPV) to manage the project. This independent entity would help secure funding, attract investors, and ensure professional oversight, enhancing the project's credibility and long-term viability.

What is the Mangaluru Water Metro Project?
The Mangaluru Water Metro Project aims to introduce a sustainable water-based public transport system to alleviate traffic congestion in the city and promote tourism. Inspired by the Kochi Water Metro, the project will create a seamless and eco-friendly transport option along the Gurupur and Netravathi rivers, covering key points across the city’s riverside and coastal areas.

Once operational, the Mangaluru Water Metro will offer a modern, efficient, and scenic alternative to road transport, helping transform urban mobility in the city while boosting tourism and reducing environmental impact.

Comments

Add new comment

  • Coastaldigest.com reserves the right to delete or block any comments.
  • Coastaldigset.com is not responsible for its readers’ comments.
  • Comments that are abusive, incendiary or irrelevant are strictly prohibited.
  • Please use a genuine email ID and provide your name to avoid reject.